JV “Construction of a new production line with a capacity of 6000 tons of clinker per day at Akhangaransement JSC” LLC
Contract data
Contract No.: Preliminary Feasibility Study No. 3929 of September 16, 2011.
Country: Uzbekistan
Location within the country: Tashkent, Tashkent region, Akhangaran
Start date: 09.2011
Completion date: 03.2012.
Country: Uzbekistan
Location within the country: Tashkent, Tashkent region, Akhangaran
Start date: 09.2011
Completion date: 03.2012.
Project Description
Akhangaransement JSC is located in the Akhangaran city, Tashkent region. The cement production capacity of the plant is currently 1.65 million tons per year on 4 production lines operating using the wet method. The plant has its own infrastructure of utilities, railways, and roads. It is planned to build a new technological line for the production of cement on the free areas of the plant with a capacity of 2.2 million tons per year using the dry method. The main production workshops include:
- 1.Mining shop;
- 2. Raw materials shop;
- 3. Firing shop;
- 4. Grinding and packaging shop which consists of relevant departments.
Development of working project documentation for the facility:
- STAGE 1. Coordination with the customer of the main provisions of the project's pre-feasibility study based on the initial data.
- STAGE 2. Adaptation of technological solutions developed by a foreign company to the conditions and requirements of regulatory documents of the Republic of Uzbekistan.
- STAGE 3. Completion of development of all parts of the project's pre-feasibility study, delivery to the customer for examination in the prescribed manner.
Description of the actually performed works under the contract:
- 1. Master plan and transport
- 2. Production technology
- 3. Architectural and construction solutions
- 4. Heat and energy supply
- 5. Heating, ventilation and air conditioning
- 6. Water supply and sewerage
- 7. Electrical part.
- 8. Cost-estimates
- 9. Author's supervision
- The cement production capacity of the plant is currently 1.65 million tons per year on 4 technological lines operating using the wet method.
- It is planned to build a new technological line for the production of cement on the free areas of the plant with a capacity of 2.2 million tons per year using the dry method.
- The total area occupied by the buildings is 15,000 m².