Dealer and service center for servicing MAN heavy duty vehicles
Contract data
Contract number: PFS No. 3884 of 03/01/2011.
Country: Uzbekistan
Location within the country: Tashkent, Samarkand
Start date: 07.2011
Completion date: 11.2011
Country: Uzbekistan
Location within the country: Tashkent, Samarkand
Start date: 07.2011
Completion date: 11.2011
Project Description
This project was carried out by O’zogirsanoatloyiha JSC based on the initial data of the project, JV “JV MAN Auto-Uzbekistan” LLC and is dedicated to organization of a dealership and service center for servicing heavy duty vehicles in the Jomboy district of Samarkand region with technical and financial support of the project by the German Man Truck & Bus AG. The implementation of the project will ensure the further sustainable development of the automotive industry of the republic, deepening its integration with the world’s leading manufacturers of vehicles, introduction of modern technologies for managing production processes and expansion of production with modern competitive services. The total area of the territory is 3.41 hectares. The site is adjacent to the regional center of Jomboy, the main highway and is in a favorable location towards the Samarkand city (9 km) and Farkhod village (1 km). The production program is from 250 to 1,200 trucks (truck with semi-trailer, dump truck) per year, with the sale of spare parts in volumes corresponding to the volume of service.
The Dealer and Service Center includes the following buildings and structures:
The Dealer and Service Center includes the following buildings and structures:
- - Dealer Center;
- -Showroom;
- -Diagnostics with washing;
- -Service center;
- - checkpoint;
- -Exhibition area;
- -Distribution center area;
- - fire pump station;
- -Diesel generator 80 kVA;
- -Fire water reserve tanks 2 x 350m³;
- -Water treatment plants;
- - Boiler room;
- -Canopy for emergency fuel tanks;
- -Place for household waste;
- -Fences with gates.
Description of the actually performed works under the contract:
- 1. Master plan and transport
- 2. Production technology
- 3. Architectural and construction solutions
- 4. Heat and energy supply
- 5. Heating, ventilation and air conditioning
- 6. Water supply and sewerage
- 7. Electrical part.
- 8. Cost-estimates
- 9. Author's supervision
- Project cost in the amount of eq. EUR 4,856.1 [1],
- Energy consumption: -total for the designed facility - 960 thousand kWh
- Number and capacity of installed transformers at the designed facility - 1x630kVA
- Total area of the territory is 3.41 hectares.
- Diesel generator - 80 kVA;
- All calculations of the approved feasibility study were carried out in Euros at the exchange rate established by the Central Bank of the Republic of Uzbekistan, as of June 10, 2011: 1 Euro = UZS 2,453.21; 1 US dollar = UZS 1,706.61, cross rate: 1 Euro / 1 US dollar = 1,437